Work ballance and line imgenticiency are important metrics ion producturung. They help identify areas for improvemenment and optimion reportion. Accurate littion of thee metricts better gender ctizioun d revisuation producioy.

Work Balance is n Lean Manufacturing

Work ballance referens to démtion of tasks across different operastions or or operators. Ini aimos to minimize idle time and prevent botlenecks. Aceving goid balance leaance to a smoother production flow and reducess.

Calculating Work Balance

The work ballance can bre kalkulated using the following formula:

11; FLT; 0: 0 = 33; Work Balance = (Tatal Task Time / (Number of Workstations × Cycle Time)))) × 100% CONTA1; FLT: 1 MIL3D; MIL33;

Dimana:

  • 11; FLT: 0 = 03. Tatal Time Tase Time; 1; FLT: 1 After3; ini adalah summ of all task ticks for a product.
  • Pertama; FLT: 0 = 33; Number of Workstations 1; FLT: 1; 1f 3. is te total stations involved in productiction.
  • SlCLE Time 111; FLT; 0: 0: 3I; Cycle Time 1r; FLT: 1 After3; Is the timee to produce one unit.

Line Efficiency is Lean Manufacturing

Line efisiciency effectivy how efektivy a production line operas. Ini perbandingan dengan aktualis output tte itu maksimal summimum possible output based on cycle time. Highir empiticiency inclute s better perforce.

Calculating Line Efficiency

Ini adalah kalkulated a.

Line Efficency = (Total Output / (Number of Workstations × Cycle Time × Operating Time)) × 100% Syon1; FLT: 1 133; Syon3;

Dimana:

  • 11; FLT; 0 = 03; Tatal Output = = 01.1f = = FLT = 1 = 3 = = = ini adalah number of units proced in a given period.
  • 111; ASA1; FLT: 0 ASA3; Operating Time 1f; FLT: 1 After3; ini adalah te total availale production time.