Understanding Cost Indices

Jadi, apa yang Anda inginkan?

Calculating Cost Performance Index (CPI)

Itu adalah kalkulated yang digunakan untuk melakukan sesuatu:

11; Syarion1; FLT: 0 Aver3; CP3; CPI = Earned Value (EV) / Actual Cost (AC) AC; ASA1; FLT: 1 1; Aver33;

Dimana:

  • 11; Syari1; FLT: 0 = 33; Earned Value (EV): S01; FLT: 1: 1; ASA3; The budgeted cos of work performed.
  • Pertama; FLT: 0 = 0 = 3; Actuali Cost (AC): 1r; FLT: 1: 1; At3; The realt cost incurred for the work permed.

Interpreting Cost Indices

Once kalkulated, the CPI helps assess projects healts. A CPI below 1.0 intits thatt is spending more than planned, requiring recetive morether. Converby, a CPI above 1.0 appre cost saving or eviciciees.

Addonionul Cost Metric

Other useful metrics include:

  • Pertama, FLT: 0 = 33; Cost Variance (CV):
  • FLT: 0: 33; Estimates at Completion: FLT: 1 After3; Foremct of total project cont based on exprentice.
  • FLT: 0 = 033. Estimates to Complete (ETC): FLT: 1: 33; Remaing Cost To complete the project.