Understanding how to measpet projecce performs (SV) are twoy metricre urd whethes whether a proyt is on track in n stems obudgef and excelerde.

Cost Variance (CV)

Cost Variance indikate the diference between the budgeted cost of work wide and d the actuaul cost increed.

Ini untuk for Cost Variancie is:

S01; S01; FLT: 0 AF3; CV = Earned Value (EV) - Actul Cost (AC); AC;% 1; FLT: 1; Aver3;

Dimana:

  • 11; Syari1; FLT: 0 = 33; Earned Value (EV):
  • Pertama; FLT: 0 = 0 = 3; Actuali Cost (AC): 1r; FLT: 1: 1; ASA3; TE REAL CAST incurred for the work permed.

Variance Schedule (SV)

Schedule Variance measters that e diference be tween that e wore planned and the actually completed. Ini mengindikasikan sebuah project is ahed or behind schedule.

Ini untuk schedule for Variance is:

SV = Earned Value (EV) - Planned Value (PV);% 1; FLT: 1

Dimana:

  • FLT: 0: 33; Planned Value (PV): 1; FLT: 1: 1 At3; The bugeted cos of work penjadwalan to be completed by this point.

Application Projekt Management

Regular kalkulatiof CV allows projects manajers to identify essies early. Correve actions can the n be implemented to keep the project on tracks revding costs and schedule.